What mills don't tell you

Five short reads on where contractor money leaks · updated November 6, 2026

Mills are not out to cheat anyone. They weigh thousands of loads, grade them in seconds and pay on a system somebody has to key rates into. The errors fall where nobody is checking, and in most contracting outfits nobody has time to check. These five pieces explain the usual leaks, what each one costs on a real statement, and what to do about it, with or without software.

Short weights and the shrink nobody wrote down

Every load is weighed twice: on your scale or the certified scale you use, and on the mill's. The mill pays on its number. Some loss is normal: bark, moisture, a trailer that drips on the way in. Contracts usually allow it, often around two percent, but many contracts never say the number out loud, and the mill's scale drifts one way more often than the other.

What it looks like on a statement. A run of tickets all three to four percent under your weight, on the same days, from the same scale house. One load is noise. Six loads in a week at the same gap is a pattern.

What it costs. On a 25 ton load at $22 a ton, a 3.8 percent shortfall is about $21. On the demo statement, four loads like that came to $85.30 in one week. Over a season with three crews, the same drift is a four figure number.

What to do. Keep your own weight on every ticket, write the allowed shrink into the contract, and compare the two scales every statement, not once a quarter. When the gap beats the tolerance, send the mill the pair of weights with the ticket numbers and ask them to check the scale. Mills calibrate their scales; they will take the call seriously when you bring the list.

In Greenton. The reconciliation marks each ticket beyond the contract tolerance, totals the shortfall at the contract rate and writes it into the claim.

Downgrades: when pulpwood is paid as fuelwood

The grader at the gate decides what your load is. Pulpwood, sawlogs, chip and saw, fuelwood: the names differ by mill, the prices differ by a lot. A load graded one step down can be paid at half the rate, and the statement will show only the final product and the final price, not the change.

What it looks like. Your ticket says pine pulpwood. The statement line says pine fuelwood, with a rate near $11 instead of $22. Nothing on the statement explains it.

What it costs. On the demo statement two downgraded loads cost $562.16, by far the biggest single item on the page. A downgrade is a bigger hit than any scale drift.

What to do. Match the product on your ticket to the product on the statement, every load. Ask the mill for the grading record and the photos for any load that changed class. Some downgrades are fair, a load with too much rot or the wrong species mixed in, and the record will show it. Many are a grader's judgment call that nobody reviewed, and the mill reverses them when asked with the ticket number.

In Greenton. A statement line whose product differs from your ticket is flagged as downgraded, priced at the difference, and listed first in the claim because it is worth the most.

The rate that did not change when the contract did

Prices move. You negotiate a new rate for the quarter, or a fuel surcharge, or a seasonal bump during wet weather. Somebody at the mill has to key the new rate into their settlement system, for your supplier number, for the right product, from the right date. When that step is late, every ticket in between is paid at the old rate and nobody notices because each ticket looks almost right.

What it looks like. A block of tickets paid at $21.50 when the contract says $22.00. Fifty cents a ton is easy to miss on a statement with seventy lines.

What it costs. On the demo statement six tickets at the old rate came to $75.18. Small per load, but it repeats every week until someone catches it, and it almost never corrects itself.

What to do. Keep a rate table by mill, product and effective date, and compare the paid rate on every line to the rate in force on the delivery date, not the current one. Send the mill the ticket list and the contract page; this is the easiest claim to win because the mill's own contract is the proof.

In Greenton. Contract rates carry effective dates. Every statement line is checked against the rate that applied the day the load was delivered.

The load that never made it onto the statement

A truck is weighed in, unloaded, and the ticket goes into a pile. Weeks later it is still not on any statement. Maybe the ticket was keyed to another supplier. Maybe the scale house lost it. Maybe it is on next week's statement. By the time you are sure it is missing, the mill's window for claims may have closed, and the load has become somebody else's wood.

What it looks like. Nothing. That is the problem. A missing load leaves no line on the statement to catch your eye.

What it costs. The whole load. On the demo statement three missing loads came to $1,598.55, more than everything else on the page combined.

What to do. Reconcile from your tickets to the statement, never from the statement to your tickets. List every load delivered in the period, then find each one on a statement. Anything left over after two statements gets a call with the ticket number, the truck and the scale weight.

In Greenton. Every delivered load must land on a statement. Loads that have not are listed as "delivered, not on any statement", with the claim ready.

Quota days, and why downtime needs a reason

Mills take what they need and no more. When the yard is full, the mill goes on quota: so many loads a day per supplier, or none. Your crews are scheduled, the machines are fueled, and there is nowhere to haul. A quota day is not a breakdown and not weather, yet it empties the week's production the same way.

What it looks like. A Thursday with ten scheduled machine hours per machine and no log entries from crew 2. If nobody wrote down why, the executive report says the crew did not work, and the cost per ton for the week goes up with no explanation.

What it costs. On the demo week, one quota day on crew 2 took 31.5 scheduled machine hours. Across a season, quota days are usually the second biggest loss after weather, and the one owners most often cannot prove when they negotiate next year's volume with the mill.

What to do. Record every scheduled day a machine did not run, with a reason from a short list: weather, mechanical, planned maintenance, operational, mill or customer. Keep the mill's quota notices. At contract time you walk in with the number of days the mill could not take your wood.

In Greenton. Downtime has a catalog with categories and reasons. Scheduled hours with no log entry show as a gap until someone explains it, and the executive report splits lost hours by reason so a quota day never looks like a lazy day.

Want your own statement checked? Send your last four statements and your ticket list. You get the money at risk report in 48 hours, free. Request the free check, or try it in your browser first.